CLPG Articles CLPG News & Articles

Line to shut for bridge renewal

0 Comments
200
20 Mar 2021

The Cotswold Line will be closed between Moreton-in-Marsh and Worcester from Saturday, May 29, until Friday, June 4, while Network Rail replaces a bridge at Wyre Piddle, near Pershore.

The deck of the bridge which carries the line over George Lane, north of the village, is life-expired. Other engineering work will be carried out in the area during the closure.

Trains will operate to a modified timetable between London Paddington, Oxford and Moreton-in-Marsh, where buses will replace trains to and from stations along the line to Worcester Foregate Street. A very limited train service will operate between London and Worcester Shrub Hill or Hereford on weekdays only, running via Swindon and Cheltenham. Check train times before travelling.

And on the weekend of May 29 to 30, GWR trains from Bristol Temple Meads to Worcestershire will terminate at Gloucester, where buses will replace trains to Ashchurch, Worcester and Great Malvern.

Click here for more details of altertations during these line closures and information about replacement bus services. 

  • West Midland Railway trains between Birmingham, Worcester Foregate Street, Great Malvern and Hereford and CrossCountry trains between Cardiff, Cheltenham and Birmingham, via Worcestershire Parkway, will run as normal during this period.

 

0.0
Last Modified: -/-
Related Articles: CLPG's 2020 AGM takes place online Track renewals affect GWR and WMR Sunday services Report backs £200m Cotswold Line upgrade MP gets debate on Cotswold Line upgrade plans High river levels force Cotswold Line closure Engineering work means changes to Cotswold Line trains Cotswold Line services altered due to engineering work CLPG charter heads for Settle-Carlisle Line Final day flourish for Cotswold Line HSTs Clun Castle steam trips turn back time on Cotswold Line

No Comments Yet...

Leave a reply

Your email address will not be published.